Solution Provided | Reviewed the hinge design and weld procedure, performed Finite Element Analysis (FEA) modelling on the hinges and provided a suitable approach for welding and bolting hinges .
Disciplines | Mechanical Engineering, Design
Our clients were experiencing fatigue cracking in the ramp hinges of their Loader Float. Carnac – Project Delivery Services Pty Ltd (Carnac) were engage to provide a third party review of the hinge design and weld procedure.
Give the constrained shut duration, extensive nature of the weld procedure and restricted access to the weld area, Carnac also provided alternative welding approaches and options for bolting the hinges in place.