Carnac was commissioned to oversee the installation of a new Brine Chiller at their facility, which was to be installed in a purpose-built machinery room and tied to the existing brine and cooling water reticulation system.
Environmental Constraints Assessment
Carnac were engaged to assess the operating limits of an alumina refinery in relation to its environmental licence restrictions.
Carnac’s assessment was successful in providing the client with a go-forward strategy to improve the operation’s return on investment whilst ensuring environmental limits are adhered to.
Sulphur Melting Pit Engineering Design and Drafting
Tailings Liquor Treatment Plant Debottlenecking Study
Chute Detailed Design
Refinery Pump Hydraulic Calculations
Feasibility Study for Significant Reagent Recovery Opportunity
Carnac identified several high-value opportunities for an alumina refinery that would help the client gain a competitive advantage in the alumina market. One opportunity identified involved recovering reagent from a spent liquor stream. The opportunity was developed by Carnac from a concept to feasibility study level.