Digestion Flash Vessels

Digestion Flash Vessels

The client reported that the flash vessels in the digestion facility were receiving significant internal erosion around the flash vessel inlet nozzle, the inlet riser, witches hat and cone shell. With past investigations and mitigations to minimise wear in mind, Carnac reviewed and provided recommendations on how these nozzles may be modified to potentially reduce internal vessel wear and optimise flows.

Mine Dewatering

Mine Dewatering

As the life of mine has developed, some pits have progressed to below water table operations. Carnac was engaged by the client to undertake a study to assess the preliminary engineering study performed internally by the client and identify further work to progress design with regards to plans for dewatering.

Booster Pump Mechanical Seals

Booster Pump Mechanical Seals

Increasing pump failures over 2015 were attributed to mechanical seal failures that were catastrophically failing every 2-3 weeks despite having an intended lifespan of 15 months. Carnac identified issues with the system that saved the client close to $250k in maintenance costs and over $3m in production losses, orders of magnitude greater than the $10k in consulting fees charged.

Heat Exchanger Trolley

Heat Exchanger Trolley

The plant's future expansion required two more spiral heaters to be installed, increasing the need for an upgrade or redesign of the equipment used to replace the heat exchangers. Previous maintenance activities to carry this out caused significant plant downtime and had associated safety risks.