A war memorial site required the upgrade and replacement of a bore pump on site as well as other associated equipment.
Alumina Refinery Upgrade Concept Study
The client engaged Carnac to undertake a preliminary engineering assessment of required upgrades to achieve an increase in refinery throughput, which included both production generating upgrades, such as those that would increase alumina precipitation yield and liquor flows, and production enabling upgrades.
Mine Dewatering
As the life of mine has developed, some pits have progressed to below water table operations. Carnac was engaged by the client to undertake a study to assess the preliminary engineering study performed internally by the client and identify further work to progress design with regards to plans for dewatering.