Our client engaged Carnac – Project Delivery Services Pty (Carnac) to provide concept-level engineering design and cost estimation for upgrades to the sampling station at their processing plant.
Carnac were engaged to assess the operating limits of an alumina refinery in relation to its environmental licence restrictions.
Carnac’s assessment was successful in providing the client with a go-forward strategy to improve the operation’s return on investment whilst ensuring environmental limits are adhered to.
The client engaged Carnac to undertake a preliminary engineering assessment of required upgrades to achieve an increase in refinery throughput, which included both production generating upgrades, such as those that would increase alumina precipitation yield and liquor flows, and production enabling upgrades.