The client engaged Carnac Project Delivery Services Pty Ltd (Carnac) to provide detailed engineering design for several issues on site. Carnac provided the client with detailed engineering design to address these issues.
Ammonium Nitrate Shed Conveying Modification
Gas Bottle Storage Facility
Radial Stacker Rail Replacement
Mine Sustaining Project
The client aims to expand production rates from 24Mtpa of iron ore to 28Mtpa by 2015. The ore is processed on site before being loaded onto rail. Carnac was commissioned to provide advice and recommendations regarding options to realise sustained production with lower operating costs, with works expected to be implemented between 2015 and 2017.