Carnac successfully completed an assessment and identified the root cause of leaks on a newly installed main stack of a TiO2 facility using drone photography and videography.
Emergency and Filtered Water Line Replacement
Groundwater Remediation Project
Green House Gas Reduction (GHG) by Energy Improvements
Gas Bottle Storage Facility
War Graves Bore and Tanks
Alumina Refinery Upgrade Concept Study
The client engaged Carnac to undertake a preliminary engineering assessment of required upgrades to achieve an increase in refinery throughput, which included both production generating upgrades, such as those that would increase alumina precipitation yield and liquor flows, and production enabling upgrades.